-
Joan Solà Ortega authored
It is required that the measurement and covariance are set at construction time. This avoids dangling with null covariances which are not invertible.
Joan Solà Ortega authoredIt is required that the measurement and covariance are set at construction time. This avoids dangling with null covariances which are not invertible.