Forked from an inaccessible project.
-
asantamaria authored
Working with unina arm and IRI arm v2. VS as first task and Joint limits as second (CoG needs to be fixed and joint limits switched to third task)
asantamaria authoredWorking with unina arm and IRI arm v2. VS as first task and Joint limits as second (CoG needs to be fixed and joint limits switched to third task)